| 45 |
INTRODUCTION
If the waste sludge/solids has calorific value, heat is generated in Fluidised bed chamber. This reduces the fuel consumption in After burner reducing the running cost of the system. |
||||||||||||||||||||||||||||
WORKING PRINCIPLE OF INCINERATOR See Figure No.1Figure 1 depicts working of an Incinerator.
|
|||||||||||||||||||||||||||||
MAIN COMPONENTS OF INCINERATOR 1. F. D. Fan.
2. Heat Recovery Air Preheater See Figure No. 2
3. START-UP BURNER. See Figure No. 3
4. Fluidised BED CHAMBER See Figure No.4 It consists of
Following is essential for proper design of fluid bed chamber: SS nozzles used instead of ceramic tile bed for following reasons:
5. CYCLONE
6. AFTER BURNER TO DESTROY VOCs
7. HEAT RECOVERY HEAT EXCHANGER See Figure No. 98. SCRUBBER SYSTEM
9. I.D. FAN
Salient Features:
10. CONTROL PANEL/ INSTRUMENTATION.
|
|||||||||||||||||||||||||||||
EXCLUSIVE FEATURES
|
|||||||||||||||||||||||||||||
HOW OUR INCINERATORS ARE HIGHLY ENERGY EFFICIENT
|
|||||||||||||||||||||||||||||
| APPLICATIONS
|